We did a Master bath, bedroom remodel in Nov/Dec 2017. I LOVE the end result! The process was a little rough, though. I knew going in there was the possibility for things to get off schedule, & they did. If I was to start over, I would make sure EVERY detail was addressed, & I had a working plan of the project.
Demo went ok. Electrician went ok, ( but didn't have a ladder & had to use mine) Plumber went ok. Drywall repair was ok, but when I pointed out a few things, he said 'paint will fix that'; it didn't, also some plugs were moved, & the holes weren't covered by the plates ( & used my ladder). Painting was sub par( & used my ladder). I specified Sherman Williams, & they brought Dunn Edwards. Color is same, but I can't use their paint to touch up closet I painted with S.W. Also, they didn't cover wall plugs, & switches, or most of the new cabinets (installed before drywall repair & paint, seems backwards to me) I had a LOT of clean up when they were done! Cabinets are beautiful, & installation went ok. Countertops are great! Tile ended up great, but had issues all the way through. They had a plan to build a curb in the shower, we specified curbless. Set us back at least 3 days to get that removed. We wanted bullnose tile as our baseboard. CK MADE (without asking me) bullnose out of 12x24 tile, with pattern vertical, if they had ordered it, pattern runs horizontal. They had to order correct tile. Also had to order more shower floor tile because of their curb mistake. It took tile guy 5 days to pick up his wet saw, & misc. tools. Took us 6 hours to clean tile, walls, doors...
I would use them again, but would make sure EVERY DETAIL is addressed. They ASSUME too many things without checking. They were good at answering issues pretty quickly.