Rebecca G.
07/05/2023 12:00:00 SA
OH this is going to be a loooong review. I first talked to Alberts around May 17th and was told that they were scheduling out about a week or two. I got several estimates, but went with Albert's because I am on a tight timeline. I was looking for someone to put in 2 forced air systems (heat and AC). I wanted this for several reasons:
1. I do not like how minisplits look on the inside or outside of the house
2. the house has several built ins and fireplaces that make the placement of minisplits less than ideal
3. I don't like boilers
4. I don't like how the radiators look in rooms with boiler heat
I know these are all cosmetic, but if I am willing to pay 1/3 of the price I paid for the house to put in the system I want, I should get the system I want.
After confirming again that they could start working the week of May 22nd I verbally agreed to the contract and set an appointment to sign it. When the sales guy arrived with the contract, it was missing some things, so he said he would reprint it. I didn't get the corrected contract back until around May 24, 2023 (that's the day they emailed it, I might have signed it a few days later). I was a little annoyed at this point because I was told it was a 2-3 day job and was signing the contract on the day I initially was told the job would be done by. I was waiting on ALL other work to the house because Albert's was going to remove the boiler and baseboard radiators, when the radiators are removed I would need baseboard work and drywall before I could put in floors.
Everything just kept being rescheduled and pushed back to wait for HVAC.
On May 24th I was told that they would start work the next week (May 29th, 1 week late).
The next week I call to see when they are coming. I am told that because of the holiday they are behind and they will call to schedule by the end of the week. After getting the run around for a week, I finally get a VM on June 6th from the sales guy saying that they will begin the work on June 12th (4 weeks late).
On June 12th, I was on a work trip and got a very vague VM from the sales guy telling me that there were some things he wanted to talk to me about. We were going to need to cut attic access and they wanted to change the original location that we decided on, because they didn't think there would be access to the whole attic from that location. I knew that there was access to the whole attic from that location, because it is my grandparents house.
They didn't believe me. They then told me that they were not comfortable proceeding until I was back in town to go over several things.
I met with both the sales guy and the main HVAC guy as soon as I was back in town. The main HVAC guy told me that it was not possible to put in 2 forced air systems and that I would have to use minisplits and a boiler. We were standing in the basement when they said this. I immediately turned around and walked away.
I cried, then I called my mom, then I called all 4 other companies I had gotten estimates from, then I cried again.... All while the sales guy and main HVAC guy stood in my basement waiting for me to come back.
All of the other companies were willing to do the work, but would be 3-5 weeks out, Albert's said they would be able to start on the minisplits and boiler the next week. I got the new contract on June 16th and was told the work would start early the next week. They finally got to work on June 21st (almost 6 weeks later than I was originally told) and left an absolute mess (that is in the pictures) on the stairs floor. I had also started all of the other work on the house at this point (since we were no longer removing the baseboard radiators), so there were drywallers, paint, electricians, and my mom in and out of the house. After the first day of work I got a text that said, the guys will do their best to work around my mom or anyone else who may be on site while they are working. I don't know if it was the whole ordeal or what, but that message did not sit well. I was told at this point that the work would be done by Friday June 23.
It was not.
On Friday, we were told that the hot water was working but the AC would be finished Monday. My mom then proceeded to take a shower on Saturday. When she came out of the shower she was shivering and said, I think your hot water is colder than my cold water. The hot water did not work. They told me that tankless water tanks can take a while to warm up. Then they said they would fix it Monday. Tuesday, we do the inspection and the boiler isn't heating, so they work on that again, and I pay (because I think everything is working). Then the next time I am back the hot water doesn't work again and the whole system is off (he just turned it back on, still waiting to see what happens next). Overall, I am glad to have AC and glad to be done with it, but I am unhappy I paid so much for something I didn't want, because I got stuck with Albert's based on my timeline and their lateness.