Literally everything that was done was against plumbing code. He compromised the structural integrity of my walls and notched 2/3 of the studs out. Everything was done so sloppy that other contractors that saw the job before drywall said he should be on the news for what he did. A lot of hard lessons from this were learned and a lot of money spent. Avoid at all cost.