Best Plaster Installation in Phoenix AZ
I would have written this review sooner, but we've been too busy enjoying our new bathrooms!
My wife and I bought a home back in Feb.'17 and wanted a remodel to both bathrooms that included an expansion to the main bathroom by moving some walls and plumbing in an oversized laundry room.
It was our first remodel, and all we knew of remodels was that there are a million shows on television about them, and there's always a problem. With that in mind, we were very open to the following:
1) things will probably cost more as the project goes on
2) it may not be done on time
3) our living situation will not be ideal for a few weeks
And those things happened. All of them. All we could do was manage our expectations. DJ, who was our point of contact for the remodel, managed everything else.
He was great at communicating our options. He returned a call within hours of us leaving a message. Every time. When we had an issue with something, he reacted.
That last paragraph is important.
Almost as important as the finished product.
I kid you not, I was taking 2 showers a day in that first month, just because I loved being in that bathroom.
Should we ever need another remodel to our home, I've got DJ's number in my phone.
-DB
https://www.vetsbuilt.com
My wife and I bought a home back in Feb.'17 and wanted a remodel to both bathrooms that included an expansion to the main bathroom by moving some walls and plumbing in an oversized laundry room.
It was our first remodel, and all we knew of remodels was that there are a million shows on television about them, and there's always a problem. With that in mind, we were very open to the following:
1) things will probably cost more as the project goes on
2) it may not be done on time
3) our living situation will not be ideal for a few weeks
And those things happened. All of them. All we could do was manage our expectations. DJ, who was our point of contact for the remodel, managed everything else.
He was great at communicating our options. He returned a call within hours of us leaving a message. Every time. When we had an issue with something, he reacted.
That last paragraph is important.
Almost as important as the finished product.
I kid you not, I was taking 2 showers a day in that first month, just because I loved being in that bathroom.
Should we ever need another remodel to our home, I've got DJ's number in my phone.
-DB
Phoenix, AZ